Migration Services


Moving what runs your business, without stopping it

Inventory first, waves second, a rollback at every gate

Migration is the work most likely to be judged on a single weekend. We plan it so that weekend is uneventful. Everything is inventoried before anything is quoted, moves are sequenced so a problem affects one site or one department rather than the whole company, and every gate has a way back. The plan is written down and handed to you, not held in someone’s head.

Data Centre Migration

Facility-to-facility relocation, on-premise into colocation, or several sites consolidated into one.

Inventory and Dependency Mapping

Every asset, its dependencies and its tolerance for downtime, recorded before anything is quoted. This is where the surprises are.

Destination Design

Rack elevations, power and cooling, cross-connects and carrier diversity designed at the target facility before the first unit is de-racked.

Wave-Based Relocation

De-rack, transport, re-rack, re-cable and power-on validation, sequenced around your business calendar.

We hold relationships with four data centre operators — Yotta, NTT DATA, CtrlS and Tata Communications — so the destination is chosen against your latency, compliance and disaster recovery requirements rather than against whichever contract we happen to hold. Facility and rack detail is set out on Infrastructure.

Application Migration

Workloads to AWS or Azure, between clouds, or back from cloud into colocation where the economics demand it.

Assessment Before Movement

What should move, what should not, and what each option costs, including staying where you are. Sometimes a workload should not move at all.

Rehost, Replatform or Refactor

Decided per workload rather than as a blanket policy, with dependency mapping so nothing moves without the systems it talks to.

Rehearsed Cutover

Planned in waves and rehearsed before the live run, with a rollback at every gate and windows agreed around your calendar.

Lift-and-shift estates almost always run above what the workloads actually need, so rightsizing after the move is part of the engagement rather than a separate project. Application migration is delivered by our own engineers rather than subcontracted, so the people who designed the cutover are the people who run it.

Email Migration

Mailbox and workspace moves to Microsoft 365 or Google Workspace, tenant-to-tenant after a merger, or off legacy on-premise mail.

Pre-Migration Audit

Mailbox sizes, shared mailboxes, distribution lists, delegate permissions and public folders — the items that break a migration when found late.

Coexistence or Cutover

A staged move where that suits the business better than a weekend, with mail routing, DNS and MX changes planned so nothing bounces.

Archives and the First Week

PST and archive handling with retention and legal hold preserved, then mobile re-profiling, client reconfiguration and user support.

We move in both directions between the two major platforms — Microsoft 365 to Google Workspace and Google Workspace to Microsoft 365 — which is a different job from a straight upgrade: calendar and contact fidelity, shared mailbox and group equivalents, and drive content all have to be mapped rather than copied. Licensing, tenant setup and ongoing administration are covered under SaaS.

Data and Platform Migration

The migrations that are not about moving a machine, but about changing the shape the data or the application sits in.

Database Migration

Between relational platforms, and between relational and flat-file or file-based structures in either direction, with row counts and integrity reconciled before sign-off.

Legacy Application Migration

Moving a site or application off legacy technology onto a current stack, keeping behaviour and data intact rather than rebuilding from a blank page.

Validation and Reconciliation

Source and target compared record by record. A migration is not finished when it completes, it is finished when it reconciles.

How a Migration Runs

01. Discover

Inventory, dependencies, downtime tolerance and the constraints nobody wrote down.

02. Design

Target state, wave plan and rollback position, costed and agreed before work starts.

03. Rehearse

Cutover tested against a representative subset. An untested cutover is a plan, not a capability.

04. Cut Over

Executed in waves, validated at each gate, documented and handed back to your team.

Start with an inventory

Send us what you are running and where it runs today. You get back what should move, what should stay, what each option costs, and where the risk actually sits. No cost, and the assessment is yours either way.

Request a migration assessment